Company
Activities
Services
Projects Contact
Home
Enerchimi
Engineering Company
O
i l & G a s F
i e l d |
|||
Year |
Client |
Project
Description |
Scope |
2008 |
National Iranian South Oil Company (NISOC) | Basic and Detail Engineering for machinery replacement of BIBI HAKIMEH 1 & 2 Compressor Station and Preparing "PC" Tender Documents |
Basic and Detail Engineering (in hand) |
2008 |
Petropars | South Pars Phase 12, EPC1 Package |
Engineering (Project handled as Joint venture) (in hand) |
2008 |
Arvandan Oil & Gas Company | Design And Engineering Servises for All Projects of Arvandan Oil & Gas Company. |
Design & Engineering (in hand) |
2007 |
National Iranian Eng. & Construction Company | Project Management Services (MC) of Shahzand Arak refinery expansion & upgrading project |
MC (Project handled as Joint venture)(in hand) |
2007 |
Pars Oil & Gas Company | Basic Design And Preparation Of EPC Package For Assaluyeh Condensate Storage Tank Farm. |
Basic Engineering & EPC package preparation (in hand) |
2006 |
KISH Free Zone Org. Development & Management of KISH Port & Air Port Co. | Kish International Air Port Aviation Fuel Facility. |
Engineering(Project handled as Joint venture)(in hand) |
2006 |
Shahid Rajaee Port Special Zone | Technical Inspection of Crude Storage Tanks |
Technical Inspection (in hand) |
2006 |
NISOC | Desalting Ahwaz 1 to 4, Haftkel and Naftsefid |
Conceptual, Basic Engineering & EPC package preparation (in hand) |
2006 |
IIOC | Technical services tor various Fields |
Technical Services (in hand) |
2006 |
OIEC | Siri
Island Gas Gathering and NGL Plant |
Construction Supervision (in hand) |
2005
- 2006 |
NISOC | Development of Master Plan for South Gas Fields, Conceptual and FEED for Pazanan Khami Gas Field Development. |
Conceptual,
Basic Engineering & EPC package preparation (in hand) |
2005 |
ICOFC | Shanul / Homa / Varavi
(Parsian) Gas Treating Plant |
Managing Contractor (in hand) |
2005 |
IOOC | Salman Complex Produce Water Re-injection Project |
Conceptual,
Basic Engineering & EPC package preparation |
2005 |
Pars Oil & Gas Company | Construction Supervision of re-routing of a portion of 56” pipeline
from Assaluyeh to Kangan Refinery |
Management / Supervision Commissioning & Startup (in hand) |
2005 |
NIGC | Ilam Gas Treating Plant |
Construction Supervision (in hand) |
2004 |
Sarkhoon & Gheshm Gas Refining Co. | Fire fighting Facility Khoon Sorkh, Bandar Abbas |
Basic
Engineering |
2004 |
Lavan Oil Refinery Company | LPG Unit & Dual purpose Jetty |
Managing Contractor (in hand) |
2004 |
NIOC / ICOFC | Sarkan & Malehkuh oil Production unit |
Basic Engineering & Preparation of Docs. for EPC package |
2004 |
Sarkhoon & Gheshm Gas Refining Co. |
Review of existing design and process modification based on new feed conditions | Conceptual & Basic Engineering |
2002 |
NIOC Oil Engineering and Development Co. | Supervision of engineering and construction of AMAK project being executed by IRITEC / IRASCO joint venture |
Construction Management / Supervision (in hand) |
2001 |
National Iranian Eng. & Construction Company | Managing Contractor for Distillation Area Renovation and Revamp Project – Abadan Refinery |
Construction Management , Supervision |
1999 |
Pars Oil & Gas Company | Construction Supervision of 56” pipeline from Assaluyeh to Kangan Refinery |
Management / Supervision Commissioning & Startup |
1999 |
NIOC Central
Areas |
|
Engineering , Procurement & Construction Management / Supervision |
1999 |
Iranian Offshore Company, Kharg Island | Installation of a New 42” Line for export of mixed Foroozan crude oil from Azarpad Sea Island. |
Engineering |
1997 |
NIOC (Onshore Fields) | ‘AMAK’ project involving gathering 220 MMSCFD Bangestan associated gas (from Ahwas, Mansuri, Marun, Ab-Teymur and Kupal fields), compression, dehydration, sweetening and NGL recovery (21000 bbls / day – utilizing existing NGL units). |
Engineering & Procurement (Project handled as Joint venture) |
1997 |
EIED |
Expansion of Khangiran Gas Treatment Plant comprising one additional Sulfur Recovery unit and utilities expansion |
Engineering |
1997 |
EIED | South Pars Gas Field Development (phase I) – Engineering of selected units |
Engineering |
1996 |
NIOC (Offshore Fields) |
Rehabilitation and Renovation of Resaalat Offshore Platforms |
Engineering (Project handled as Joint venture) |
1996 |
NIOC (Offshore Fields) | Equipment and piping inspection of Aboozar Offshore Platform |
Plant/Equipment Inspection |
1996 |
EIED |
Iran Europe Gas Supply Project-participation in feasibility study comparing shipment of liquefied methane versus transfer of dry gas through trunk line system (excluding patent units) |
Study |
1995 |
NIOC | Parsi Gas Injection Project, involving procurement of materials and equipment from internal sources, including technical inspection, transportation and delivery services |
Procurement |
1994 |
Encon Systems Limited |
Renovation of Azerbaijan Gas Processing Plant located near Baku. The plant consists of six identical gas treating units with total capacity of six billion NM3 per year and one heavy condensate fractionation unit with total capacity of 670.000 tons / year |
Study & Engineering & Procurement |
1992 |
NIOC - Fields | Bibi-Hakimeh / Rag-e-Safid Gas Injection project consisting of a pipeline system for gathering 165 MMSCFD associated gas from crude oil production units in Bibi-Hakimeh and Rag-e-Safid oil fields, 5 compressor stations, transfer lines and gas injection network |
Construction Management / Supervision |
1991 |
IOOC |
Rehabilitation and renovation of crude oil production units at Kharg Island (total capacity 240,000 B / D), including gas / oil separation, desalting and pumping facilities |
Engineering, Construction Management / Supervision |
1989 |
NIOC | Design review of Moharram Project, involving the 56” Section (210 km) of crude transmission pipeline and related facilities. This pipeline has been designed to transport crude oil from Gurreh Pump Station to new loading facilities at Bandar Taheri and has a total length of 310 km |
Engineering |
1989 |
NIOC |
Basic design and engineering for installation of crude oil products depot next to Arak Refinery including 21 storage tanks with a total capacity of 690,000 cubic meters, several pump stations for various products, transfer lines, truck and railway loading facilities, buildings and other related facilities |
Engineering, Construction Management / Supervision |
1989 |
IOOC | Rehabilitation and renovation of crude oil production facilities at Lavan Island, including crude metering, gas/oil separation, desalting and gas sweetening facilities |
Engineering, Construction Management / Supervision |
1988 |
NIOC - FIELDS |
Modification and completion of detailed engineering of Bibi-Hakimeh/Rag-e-Safid Gas Injection Project consisting of a pipeline system for gathering the associated gas from crude oil production units in Bibi-Hakimeh and Rag-e-Safid fields, 5 compressor stations, transfer lines and gas injection network with a total capacity of 270 MM SCFD |
Engineering,
Procurement |
1988 |
IOOC | Basic design and engineering for installation of additional gas compressor and related facilities at Salman Offshore platform to increase gas lift capacity |
Engineering |
1988 |
NIOC |
Kangan Natural Gas Project (phase II) consisting of gas gathering and production facilities in Kangan Gas Field, transfer lines,expansion of capacity of gas processing facilities installed in phase I from 1200 to 2800 MMSCFD via four additional treatment trains,expansion of utilities units and installation of water and glycol transfer lines as well as power transmission line between the central gas processing facilities and Kangan field production units |
Construction Management / Supervision (Project handled as Joint venture) |
1987 |
NIDC | Centralization of Facilities and Services of National Iranian Drilling Company with the object of determining the most suitable location and facilities needed for NIDC to provide offshore and onshore drilling service throughout the country |
Study |
1987 |
NIOC |
Detailed engineering of utilities for Arak Refinery (capacity:240,000 B / D) including air and water required for various refinery units |
Engineering |
1986 |
IOOC | Feasibility Study of Khuff Gas Development in Salman Field including offshore production platforms, submarine and land transfer lines and onshore gas processing facilities |
Study |
1983 |
NIOC |
Kangan Natural Gas Project (phase II) consisting of gas gathering and production facilities in Kangan Gas Field, transfer lines,expansion of capacity of gas processing facilities installed in phase I from 1200 to 2800 MMSCFD via four additional treatment trains,expansion of utilities units and installation of water and glycol transfer lines as well as power transmission line between the central gas processing facilities and Kangan field production units |
Engineering, Procurement (Project handled as Joint venture) |
1983 |
NIOC - FIELDS | Ramshir Gas Gathering Project consisting of gathering and compression of associated gas from various stages of separation at Ramshir crude oil production unit |
Engineering |
1981 |
NIOC |
Kangan Natural Gas Project (phase I) consisting of production facilities in Nar Gas Field, gas transfer line, central gas processing facilities (including dehydration and sweetening units and utilities) with a capacity of 1200 MM SCFD |
Construction Management / Supervision |
|
|||