Engineering, procurement and construction project of air separation unit (ASU) with oxygen production (capacity of 72000 Nm3 / hr) is located in Dayer area of Bushehr province.
Client: Siraf Energy Investment Company.
js_composer
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/fatehgro/enerchimi.com/wp-includes/functions.php on line 6121ultimate_vc
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/fatehgro/enerchimi.com/wp-includes/functions.php on line 6121