Gurreh-Jask Pipeline with a length of 1000 km and a capacity of one million barrels was installed. The first phase of with a capacity of 350000 barrels was put into operation on dated 22.July.2021.
Enerchimi Engineering Co. was responsible for the detailed design of the Part 1-2 of this pipeline in impassable and mountainous area a length of 157 km with equipment and devices between the route of the pipeline.